UNDER CONSTRUCTION - REI TI, Grand Junction

   
ADDENDUM 1, 2, 3 & 4 HAVE BEEN POSTED BELOW

Location:     925 Independent Ave, Grand Junction CO 81505

RFI's:     Are due in writing to adecker@fordconstruction.org

Project Scope:     Tenant Improvement in an “Open Store” that will be in full operation requiring the TI work to be done overnight for the majority of the project.  Work includes selective demolition, concrete floor sealer, cast-in-place concrete, concrete paving, hydraulic cement underlayment, masonry, structural steel, light gage framing, metal fabrications, rough carpentry, finish carpentry, architectural and ornamental woodwork, building insulation, fire stopping, joint sealants, wood doors, HM doors, custom entry doors, double acting doors, glazed aluminum framing, skylights, door hardware, automatic door operators, glazing, drywall, tiling, acoustical ceiling, resilient flooring and base, carpet tile, FRP, painting, visual display unit, code signage, wall surface protection, toilet and bath accessories, fire extinguishers, loading dock equipment, floor mats, bike racks, fire sprinkler system modifications, plumbing, HVAC, electrical.                        
 
Taxes:    This project is NOT tax exempt. Please include sales taxes in your proposal. 

Project Schedule of Dates: 
    Pre-Submittal Question Deadline:    Friday May 25 2018 @ 12:00 pm
    Deadline for Proposal Submittal:       Friday June 1 2018 @ 12:00 pm
    Construction Dates:                             July - October 2018    
    
If you have any questions or comments feel free to contact me at (970) 245-9343. Thank you!