UNDER CONSTRUCTION - Montrose City Hall Annex Centennial Room Rehabilitation


Location:     433 S. First Street, Montrose, CO 81401

Accepting Proposals by Email:     No later than 11:00 am Thursday September 28, 2017.

RFI's:     Due in writing no later than 12:00 pm September 21, 2017.

Project Scope:     Remodel of existing meeting room to accommodate proposed floor plan. Change door and window configuration on east facade. At this same location historic repairs including masonry work will need to be performed.  Provide new egress door on south facade. Remove existing swamp cooler and replace with a roof top package unit and base board heat system.  Work includes: Demo; Historic Demo; Cast-In-Place Concrete; Masonry Restoration; Structural Steel and Fabrication; Architectural Wood Restoration; Rough Carpentry; Structural Wood; Finish Carpentry; Sheet Metal Flashing & Trim; Wood Doors; Hardware; Glazing; Plaster Restoration; Tin Ceilings; Painting; Drywall; Flooring; Corner Guards; Mechanical; and Electrical.
 
Taxes:     The project is tax exempt. Please do not include taxes in proposal.

Project Schedule of Dates: 
  • Pre-Submittal Question Deadline:     Thursday September 21, 2017 @ 12:00 pm
  • Deadline for Proposal Submittal:     Thursday September 28, 2017 @ 2:00 pm
  • Anticipated Construction Start:     30 Days After Bid Date
  • Anticipated Construction End:     March 31, 2018

Please complete the lower portion of the ITB and email to the email address below.  If you have any questions or comments feel free to contact me at (970) 245-9343. Thank you!

Amanda S Decker
Chief Estimator
Ford Construction Company Inc.
Phone (970) 245-9343
Email: adecker@fordconstruction.org  