BIDDING - CDOT Craig HVAC Upgrades
Location: 270 Ranney St, Craig, Colorado 81625
Accepting Proposals by Email: No Later than 11:00 am on Thursday May 6th 2024.
RFI’s by Email: No Later than 2:00 pm on Thursday April 25th 2024.
Project Scope: This scope covers the removal and proper disposal of existing MEP equipment, as well as the installation of new MEP equipment and connection to existing systems. Please consult the MEP drawings for detailed information. Additionally, the project entails the replacement or addition of concrete pads, thermal insulation, hollow metal doors and frames, metal framing, outlets, gypsum board assemblies, reconfiguration of acoustical ceilings, and painting.
Taxes: Project is tax exempt. Please do not include material sales tax.
Bid Form: Be sure to include a cost breakdown of your Proposal.
Project Schedule:
Pre-Submittal Question Deadline: 4/25/2024 no later than 2:00pm
Deadline for Proposal Submittal: 5/06/2024 no later than 11:00am
Anticipated Construction Duration: June 2024 – September 2024
Please complete the lower portion of this ITB to let us know if you are bidding and email to the email address below. If you have any questions or comments, feel free to contact me at (970) 245-9343. Thank you.
Dawson Springer
Estimator
Ford Construction Company, Inc.
dawsons@fordconstruction.org
DOCUMENTS:
- INVITE TO BID
- CRAIG HVAC - ADVERTISEMENT
- CRAIG HVAC - APPENDIX A - INFORMATION
- CRAIG HVAC - APPENDIX B - BID FORM
- CRAIG HVAC - APPENDIX B1 - BID BOND
- CRAIG HVAC - APPENDIX C - LABOR
- CRAIG HVAC - APPENDIX D - WAGE RATE
- CRAIG HVAC - APPENDIX E - WAGE FORM
- CRAIG HVAC - APPENDIX F - PERFORMANCE BOND
- CRAIG HVAC - APPENDIX G - LABOR/MATERIAL BOND
- CRAIG HVAC - APPENDIX H - SAMPLE CONTRACT
- CRAIG HVAC - APPENDIX I - PROCEDURAL DOCS
- CRAIG HVAC - APPENDIX J - SCOPE
- CRAIG HVAC - APPENDIX K - CONSTRUCTION DOCS
- CRAIG HVAC - APPENDIX L - SPECIFICATIONS
- ADDENDUM 1